CR Power Mains & Grid Integration Project

CR Power Shandong Mains&Grid&User Integration Demonstration Project is located in Kenli District, Dongying City, Shandong Province. The planned energy storage capacity of the project is 101MW/202MWh, including 100MW/200MWh solid state battery and 1MW/2MWh flow battery.

  • Location: Dongying, Shandong
  • Scale: 101MW / 202MWh

CR Power Hongguang Fishery PV Power Generation Project

The project uses Super Power solid-state batteries and consists of 32 energy storage units, each including two 2.5MWh battery cabins and a 2.5MW PCS booster cabin. It was connected to the grid and commenced operation in December 2022.

  • Location: Dongying, Shandong
  • Scale: 80MW/160MWh
offshore-wind-power-platform-mounted-for-ship-bess
CR-Power-MainsGridUser-Integration-Pilot-Project

CR Power Mains&Grid&User Integration Pilot Project

The project is located in Kenli District, Dongying City, Shandong Province, and plans to build a 50MW (100MWh) energy storage system, which consists of 40 1.25MW/2.5MWh BESS and 80 630kW PCS, configured into 20 integrated energy storage units. Each energy storage unit consists of 1 2.5MW transformer, 4 630kW PCS, and 2 1.25MW/2.5MWh containerized BESS.

  • Location: Dongying, Shandong
  • Scale: 50MW/100MWh

Offshore Wind Power Platform Mounted For Ship BESS

Super Power’s marine energy storage power station, equipped with a battery pack, BMS, liquid cooling unit, and DC cabinet, serves as an emergency or hybrid power source for ships. Activated when generator output is insufficient, it supports increased emergency demands. This installation marks China’s first wind power platform energy storage project and Super Power’s inaugural marine energy storage system.

  • Location: Dalian Shipyard
  • Scale: 1MW/1.3MWh
11111
Hubei-State-Grid-dispatch-building-UPS-project

Hubei State Grid Dispatch Building UPS Project

The project provides a UPS and communication power supply for the Hubei State Grid Information and Communication Dispatch Building, primarily supporting EPS (Emergency Power Supply) and voltage regulation for dispatch center equipment. It utilizes four 512V/1000Ah battery systems for the 400KVA UPS, along with communication power supplies of 48V/4000Ah and 48V/3000Ah, making it one of the largest battery setups for backup and communication power used by the State Grid.

  • Location: Hubei
  • Scale: 2.7MWh

Solid-state BESS Project for Black Start and Frequency Regulation of Gas Turbine Combination Cycled Units

Shenzhen Guangqian Electric Power Co., Ltd., a subsidiary of Guangdong Energy Group, invested in and commissioned a 27.52 MWh semi-solid battery energy storage system at the Shenzhen Qianwan Power Plant in July 2024.

  • Location: Shenzhen
  • Scale: 27.52 MWh
Read more
semi-solid-battery-energy-storage-system-project-for-black-start-and-frequency-regulation-of-gas-turbine-combined-cycle-units
Shenzhen Communication Base Station Project

Shenzhen Communication Base Station Project

Shenzhen Lingshi Smart Energy Co., Ltd. is investing in a communication base station energy storage project, set to begin operation in Shenzhen in October 2024. The project will have a total capacity of 3 MWh and uses a standardized solution with a single unit rated at 13 kW/40 kWh.

  • Location: Shenzhen
  • Scale: 3MWh
Read more

Huaneng Changxing Shared Energy Storage Project

The Huaneng Changxing 100MW/200MWh Shared Energy Storage Project was invested in and built by Huaneng (Zhejiang) Energy Development Co., Ltd., Changxing Branch. A segment of the project, with a capacity of 13.5MW/26.8MWh, was commissioned in Changxing, Zhejiang Province in June 2024.

  • Location: Changxing, Zhejiang
  • Scale: 13.5MW/26.8MWh
Read more
huaneng-changxing
zhejiang-longquan-lithium-iron-phosphate-lfp-energy-storage-demonstration-project

Zhejiang Longquan Solid-state Battery Energy Storage Demonstration Project

The Zhejiang Longquan solid-state battery Energy Storage Demonstration Project, with a total capacity of 200MW/400MWh, was developed by Longquan Henglong Energy Storage Technology Co., Ltd. Phase I of the project, totaling 223MWh, was commissioned in June 2024 in Lishui, Zhejiang Province.

  • Location: Zhejiang Longquan
  • Scale: 200MW/400MWh
Read more

Jiangsu Provincial Government Talent Exchange Center Project

This project is a combined photovoltaic and energy storage project. The system adopts 20 units of 100KWh solid-state independent energy storage cabinets, each of which is of the model SPS-358V50KW/100KWh-PVIC, independently developed and researched by Super Power.

  • Location: Jiangsu
  • Scale: 1MW/2MWh